Potable water and sewerage systems to be installed in two villages of Zangilan
Infrastructure
- 07 August, 2025
- 17:09
Construction of water supply and sewerage networks and facilities has begun in the villages of Aghali and Mammadbayli in the Zangilan district.
According to Report, the Administration of Ongoing Construction Projects under the State Water Resources Agency of Azerbaijan has launched preparations in connection with the project.
As part of the initiative, a 17.723-kilometer-long water pipeline made of polyethylene pipes will be laid from the Makhrizli reservoir.
In addition, 1,405 meters of 400 mm diameter corrugated polyethylene (Koruge) pipes will be installed to carry wastewater. Along the line, 21 cast iron manholes will also be constructed.
Latest News
14:13
Deputy Minister: Azerbaijan–Türkiye transit shipments reach 3.5M tons
Infrastructure14:10
Deputy minister: Horadiz-Aghband railway on Zangazur corridor 69% complete
Infrastructure14:07
Azerbaijani parliament ratifies visa exemption agreement with Oman
Milli Majlis14:03
Azerbaijan completes work on e-Permit system with Türkiye
Infrastructure14:00
Kristina Kvien to complete her mission in Armenia in January
Region13:56
Photo
Cevdet Yilmaz, Sahiba Gafarova mull interparliamentary co-op
Foreign policy13:41
Photo
President Ilham Aliyev visits Karkijahan settlement in Khankendi
Domestic policy13:30
AzStateNet detects 751 APT cyberattack indicators in 11 months
ICT13:18