AAYDA reports on road construction in Karabakh and East Zangazur
Infrastructure
- 30 January, 2025
- 10:37
As part of the "First State Program on the Great Return to the Liberated Territories" during 2020-2024, 44 road construction projects are underway in Azerbaijan's Karabakh and East Zangazur economic regions under the president’s decrees, Report informs, citing the State Agency of Azerbaijan Automobile Roads (AAYDA).
AAYDA noted that 45 tunnels (total length 70.8 km), 447 bridges (total length 9,581.6 meters), and 16 viaducts (total length 3,871 meters) are being constructed.
So far, 28 tunnels (59.6 km), 392 bridges (8,339.1 meters), and 9 viaducts (1,695 meters) have been completed.
Latest News
19:19
Zayed Award 2026 honors Afghan activist and Palestinian organization
Foreign policy19:09
Photo
Kazakhstan and Pakistan sign $200 million in commercial contracts
Business18:57
Photo
Grain shipment from Russia to Armenia departs from Azerbaijan
Infrastructure18:42
President: 'We are now increasing our trade relationship with Armenia'
Foreign policy18:37
Azerbaijan doubles barley imports from Kazakhstan in January–November 2025
AIC18:25
Pashinyan calls progress in Armenia-Azerbaijan peace talks 'unbelievable'
Foreign policy18:02
Russian cluster bomb attack kills 6, wounds 1 in Ukraine's Donetsk
Other countries17:53
Video
President Ilham Aliyev: It's a great honor for me to receive the Zayed Award for Human Fraternity
Foreign policy17:51