AAYDA reports on road construction in Karabakh and East Zangazur
Infrastructure
- 30 January, 2025
- 10:37
Add Report.az to preferred Google sources
Stay up to date with the top news!
As part of the "First State Program on the Great Return to the Liberated Territories" during 2020-2024, 44 road construction projects are underway in Azerbaijan's Karabakh and East Zangazur economic regions under the president’s decrees, Report informs, citing the State Agency of Azerbaijan Automobile Roads (AAYDA).
AAYDA noted that 45 tunnels (total length 70.8 km), 447 bridges (total length 9,581.6 meters), and 16 viaducts (total length 3,871 meters) are being constructed.
So far, 28 tunnels (59.6 km), 392 bridges (8,339.1 meters), and 9 viaducts (1,695 meters) have been completed.
Latest News
11:26
Photo
Zakir Hasanov, Yaşar Güler discuss military cooperation in Shusha
Military11:24
TRIPP groundbreaking expected in early 2027
Region11:23
President Ilham Aliyev: The return of Heydar Aliyev to power was the demand of the people
Domestic policy11:22
Azerbaijani President: Following our glorious Victory, our efforts were focused on fully restoring our territorial integrity
Domestic policy11:20
Georgian Supreme Court delegation visits Karabakh
Incident11:04
President: The current Armenian leadership used to make territorial claims against us
Domestic policy10:46
YAP Chairman: This is the first time our congress is held after Azerbaijan fully restored its territorial integrity and sovereignty
Domestic policy10:44
President Ilham Aliyev: The New Azerbaijan Party is the largest political force in the South Caucasus
Domestic policy10:42