Elnur Soltanov: Reconstruction of thermal power plant in Azerbaijan's Mingachevir to save 1.5BCM of gas
Energy
- 03 March, 2025
- 15:34
Add Report.az to preferred Google sources
Stay up to date with the top news!
Reconstruction of the thermal power plant in Azerbaijan's Mingachevir will save 1.5 billion cubic meters of gas, which is equal to the annual production from the Absheron field, Deputy Minister of Energy Elnur Soltanov said at public hearings in the Committee on Natural Resources, Energy and Ecology of the Parliament, Report informs.
"This is good news for both the population and the state. The population will receive gas at a lower price, and the state will be able to use the saved gas for other purposes," he noted.
A new power plant with a capacity of 1,280 megawatts is being built in Mingachevir on the territory of the Azerbaijan Thermal Power Plant. Commissioning is scheduled for 2025.
Latest News
08:10
Photo
Video
Nine killed in plane crash in the US
Other countries
07:59
Azerbaijani wrestler Ali Tsokayev claims bronze at World Championships
Individual sports
07:43
Dakar 2026: Azerbaijani judoka Ibrahim Talibov wins gold medal
Individual sports
07:30
Photo
Azerbaijan, Suriname discuss expansion of bilateral cooperation
Foreign policy
07:22
Video
Summary of Azerbaijani President's weekly activities posted on his social media accounts
Domestic policy
07:09
Photo
First Vice-President Mehriban Aliyeva watched 'Thikra: Night of Remembering' production
Cultural policy
07:07
Photo
'Ancient stone, modern memory' and 'Radius of responsibility' projects presented
Cultural policy
17:55
Germany fails to meet gas storage target as winter approaches
Other countries
17:43
Trump says US still has 'to take care of' one or two targets in Iran
Other countries