Elnur Soltanov: Reconstruction of thermal power plant in Azerbaijan's Mingachevir to save 1.5BCM of gas
Energy
- 03 March, 2025
- 15:34
Add Report.az to preferred Google sources
Stay up to date with the top news!
Reconstruction of the thermal power plant in Azerbaijan's Mingachevir will save 1.5 billion cubic meters of gas, which is equal to the annual production from the Absheron field, Deputy Minister of Energy Elnur Soltanov said at public hearings in the Committee on Natural Resources, Energy and Ecology of the Parliament, Report informs.
"This is good news for both the population and the state. The population will receive gas at a lower price, and the state will be able to use the saved gas for other purposes," he noted.
A new power plant with a capacity of 1,280 megawatts is being built in Mingachevir on the territory of the Azerbaijan Thermal Power Plant. Commissioning is scheduled for 2025.
Latest News
00:14
Qatar, Türkiye discuss efforts to ease regional tensions
Region
00:06
Kazakhstan, Israel sign seven cooperation memorandums in Tel Aviv
Region
23:29
Tashkent hosts reception marking Azerbaijan's Victory Day
Foreign policy
23:20
Araghchi outlines Iran's seven-day plan for US talks
Region
22:46
US plans to suspend South Africa, Rwanda from duty-free trade program
Other countries
22:22
Death toll from Russian strikes on Ukrainian school rises to 24
Other countries
22:03
Atyrau–Samara oil pipeline halted after drone attack
Region
21:37
Tokayev: Those seeking to harm Kazakhstan will be held accountable
Other countries
21:18
Macron thanks Middle Eastern partners as French diesel prices fall
Other countries