Elnur Soltanov: Reconstruction of thermal power plant in Azerbaijan's Mingachevir to save 1.5BCM of gas
Energy
- 03 March, 2025
- 15:34
Reconstruction of the thermal power plant in Azerbaijan's Mingachevir will save 1.5 billion cubic meters of gas, which is equal to the annual production from the Absheron field, Deputy Minister of Energy Elnur Soltanov said at public hearings in the Committee on Natural Resources, Energy and Ecology of the Parliament, Report informs.
"This is good news for both the population and the state. The population will receive gas at a lower price, and the state will be able to use the saved gas for other purposes," he noted.
A new power plant with a capacity of 1,280 megawatts is being built in Mingachevir on the territory of the Azerbaijan Thermal Power Plant. Commissioning is scheduled for 2025.
Latest News
12:55
Tajikistan demands objective investigation into murder of 10-year-old Tajik boy in Odintsovo
Other countries12:40
S&P to evaluate Azer-Turk Bank's new development strategy
Finance12:36
KOBIA: Azerbaijan's agricultural entrepreneurs become strong economic actors open to innovation
AIC12:32
Photo
Video
Baku hosts discussions on military cooperation between Azerbaijani and Türkiye
Military12:24
Musayev: There are about 13,000 commercial organizations operating in Azerbaijan's agricultural sector
AIC12:23
Azerbaijan's non-oil and gas exports to Russia surge by 1%
Business12:13
Russia's Karelia to prepare roadmaps for co-op with Azerbaijan
Business12:07
Applications now open for WUF13 Urban Expo
Infrastructure12:00