Elnur Soltanov: Reconstruction of thermal power plant in Azerbaijan's Mingachevir to save 1.5BCM of gas
Energy
- 03 March, 2025
- 15:34
Add Report.az to preferred Google sources
Stay up to date with the top news!
Reconstruction of the thermal power plant in Azerbaijan's Mingachevir will save 1.5 billion cubic meters of gas, which is equal to the annual production from the Absheron field, Deputy Minister of Energy Elnur Soltanov said at public hearings in the Committee on Natural Resources, Energy and Ecology of the Parliament, Report informs.
"This is good news for both the population and the state. The population will receive gas at a lower price, and the state will be able to use the saved gas for other purposes," he noted.
A new power plant with a capacity of 1,280 megawatts is being built in Mingachevir on the territory of the Azerbaijan Thermal Power Plant. Commissioning is scheduled for 2025.
Latest News
23:05
Photo
Azerbaijani judokas win three gold medals at European U-23 Championships in Italy
Individual sports
21:58
Those turning a TikTok montage into political message: Turkish media urged to act responsibly
Region
21:17
Azerbaijani judoka wins silver at Abu Dhabi Grand Slam
Individual sports
21:14
Armenia-Azerbaijan peace process discussed in Bahrain
Region
20:20
Video
Erdoğan: Türkiye to continue efforts to ensure security in Black Sea
Region
19:14
Azerbaijani wrestler Arsenii Dzhioyev wins world championship silver in Astana – Updated-3
Individual sports
17:54
President Ilham Aliyev's official social media accounts: A reminder to readers
Domestic policy
17:43
Startups act as engine of economic growth, transformation, Azerbaijani deputy minister says
ICT
17:26
Sustainable energy supply vital for startup ecosystem formation, official says
Energy