Azerenerji mulls implementation of AZURE project with WB
Energy
- 27 January, 2026
- 13:04
Azerbaijan's Azerenerji and the World Bank (WB) have held discussions on the status of the Azerbaijan Scaling-Up Renewable Energy Project (AZURE), next steps, and the importance of accelerating its implementation, Report informs referring to Azerenerji.
The discussions took place during a meeting between delegations led by the company's Chairman Baba Rzayev and Charles Cormier, World Bank Infrastructure Regional Director for Europe and Central Asia.
At the meeting, views were exchanged on the prospects for integrating large-scale renewable energy sources into the grid in Azerbaijan and prospects for cooperation.
Latest News
15:23
IDF kills 2 senior Hamas operatives in Gaza
Other countries15:05
France records 1,000 excess deaths during record-breaking heatwave
Other countries14:46
Vucic: Serbian army needs more pilots ahead of Rafale deliveries
Other countries14:25
Serbia presents new, modernized defense assets at Batajnica airfield
Other countries14:13
Video
Türkiye detains 409 suspects in cybercrime operations
Region13:52
Photo
Historic UFC tournament in Baku: Fiziev claims spectacular win – PHOTOS
Individual sports13:42
Iranian strikes caused up to $5.1B in damage to US facilities, WSJ says
Other countries13:28
General: Iran developed more modern weapons during war
Region13:03