Azerenergy: ‘6 HPPs in Kalbajar have been rebuilt and put into operation’
Energy
- 25 November, 2023
- 06:57
Add Report.az to preferred Google sources
Stay up to date with the top news!
AzerEnergy has rebuilt and put into operation 6 small hydroelectric power stations (HPS) in the Kalbajar district, Report informs.
According to information, the “Kalbajar-1” station with a capacity of 4.4 megawatts was put into use in 2022, the “Chirag-1” station with a capacity of 8.33 megawatts, “Chirag-2” with 3.6 megawatts, “Gamishli” with 6.33 megawatts, “Soyugbulag” with 5.3 megawatts, and “Meydan” with 3.4 megawatts were launched in 2023.
At present, 4 HPS (Ashagi Vang, Yukhari Vang, Nadirkhanli, and Zar) are under construction in Kalbajar and planned to be commissioned in 2024.
Azerenergy: ‘6 HPPs in Kalbajar have been rebuilt and put into operation’
Latest News
11:53
Effective fishery management needed for Azerbaijan's Caspian sector, FAO says
AIC
11:51
Official: Garabagh, East Zangezur priority zones for aquaculture clusters
AIC
11:49
Greater attention needed for preservation of Caspian Sea bioresources
AIC
11:46
Fishery development to strengthen food security, regional jobs in Azerbaijan
AIC
11:37
Pakistan's Asaan Khidmat center serves over 171,000 citizens since launch
Foreign policy
11:25
UN official: Azerbaijan's ASAN Service is exemplary public service model
Foreign policy
11:17
Pakistan's IT minister receives ASAN co-op medal
Foreign policy
11:11
Photo
MoUs signed to implement Azerbaijan's ASAN Service model in Djibouti, Sri Lanka
Foreign policy
11:11
UN identifies key factors for public governance through 2040
Foreign policy