Representatives of several foreign media as part of their trip to Azerbaijan’s Fuzuli and Jabrayil districts, liberated from the Armenian occupation, got acquainted with the Victory Road construction from Fuzuli to Shusha, Report informs.
Foreign journalists visited the section of the road, the construction of which was entrusted to the Azerbaijani construction company AzVirt.
In general, the length of the Victory Road from Fuzuli to Shusha is 102 km. Its construction was entrusted to four companies, including a Turkish one.
AzVirt is building a 24-kilometer section of this road.
Earlier it was reported that the Victory Road from Fuzuli to Shusha is planned to be commissioned by the end of August this year.