Another road enhanced in Baku
Infrastructure
- 27 November, 2015
- 07:43
Baku. 27 November. REPORT.AZ/ Bekir Chobanzade street in Nizami district of Baku is under repair.
Report was told in JSC "Azeryolservis" JSC. Repair work is carried out between Mehdi Abbasov and Rustam Rustamov streets.
The length of area under repair is 924 meters and an average width of street is 15 meters.
For normal disposal of surface water from the street during the construction and repair works sewage system will be renewed, new rain bars will be installed where necessary.The underground communication lines (gas, water, heat, electricity, communication) will be transferred from the part of the carriageway.
In addition, the expansion work will be carried out in certain areas of the carriageway at B.Chobanzade street.
Latest News
21:44
Georgia seizes over $11M worth of drugs brought from Armenia
Incident21:37
EU commissioner, Turkish ministers discuss migration and security
Other countries21:30
Photo
Azerbaijan girls' boxing team tops Heydar Aliyev Cup standings with 17 medals
Team sports21:12
President Ilham Aliyev, Ukrainian President Volodymyr Zelenskyy held phone conversation
Domestic policy21:11
Photo
Azerbaijan, Türkiye expanding trade union cooperation
Infrastructure20:49
Lebanese PM says premature to talk of any high-level meeting with Israel
Other countries20:34
Israel eliminates over 2,000 Hezbollah militants in Lebanon
Other countries20:21
Trump says Iran deal possible before China visit
Other countries20:16
Photo