First well in Shafag-Asiman block to be drilled by Heydar Aliyev semi-submersible drilling rig
Energy
- 11 September, 2019
- 08:45
Add Report.az to preferred Google sources
Stay up to date with the top news!
Drilling in an exploration well in Shafag-Asiman block is to start next month, BP official Hendrik Jan De Jong said on September 11, Report informs.
According to him, the drilling works will take a year: "We’re planning to start drilling works in the last quarter of 2019. The drilling works will be carried out by Heydar Aliyev semi-submersible drilling rig. The process will take 12 months. It was identified in the Environmental and Socio-Economic Impact Assessment (ESIA) we offered to the government in August that the environmental and socio-economic impact will be low."
He said that two accidental cases had been considered. One of them is ship collision and the other is spread of hydrocarbon reserves.
Latest News
09:42
Intensive cyberattacks target Azerbaijan's state information infrastructure
ICT
09:33
Indian Foreign Minister Kirti Vardhan Singh arrives in Azerbaijan for CICA summit
Foreign policy
09:32
Lithuanian ambassador congratulates Sabah on historic Champions League victory
Foreign policy
09:24
Azerbaijan climbs one spot in UEFA rankings
Football
09:20
CBA currency exchange rates (14.10.2026)
Finance
09:13
Azerbaijani wrestler Elmir Aliyev wins silver at U23 World Championships
Football
09:08
Key indicators of world commodity, stock, and currency markets (14.10.2026)
Finance
08:59
Russia launches new wave of massive airstrikes on Kyiv
Other countries
08:48
5.7-magnitude earthquake strikes off Papua New Guinea
Other countries