Launch of Tengiz field expansion project postponed until second quarter of 2025
Energy
- 18 January, 2024
- 13:35
Add Report.az to preferred Google sources
Stay up to date with the top news!
The launch of the future expansion project of the Tengiz oil and gas field has been postponed until the second quarter of 2025, the wellhead pressure management project (WPMP) to the second quarter of 2024, according to the Ministry of Energy of Kazakhstan, Report informs referring to Interfax.
“On December 15, 2023, Tengizchevroil LLP sent a request to partners for approval, providing for the postponement of the launch of WPMP facilities to the second quarter of 2024 (from December 2023) and the future expansion project to the second quarter of 2025 (from June 2024),” reads the statement.
Latest News
13:27
Azerbaijan transports 29.7 bcm of gas through main pipelines in January-September
Energy
13:17
Indian ambassador ready to strengthen bilateral ties with Azerbaijan
Foreign policy
13:14
Photo
President Ilham Aliyev received newly appointed Indian ambassador to Azerbaijan
Foreign policy
13:13
Martirosyan: Armenia hopes to develop energy cooperation with Azerbaijan
Other countries
13:10
MP: Restoration of Azerbaijan's sovereignty resulted from struggle against occupation
Domestic policy
13:05
Von der Leyen: EU will not lift Russia sanctions until war ends
Other countries
13:02
Value of Azerbaijan's petroleum products output exceeds 4.6B manats
Energy
12:51
Azerbaijani MP: Equality and sovereignty underpin Baku's foreign policy
Foreign policy
12:50
CBA, BlackRock mull co-op prospects
AIC