Parviz Shahbazov: Serbia hopes for integration into SGC in 2023
Energy
- 04 February, 2022
- 11:51
Add Report.az to preferred Google sources
Stay up to date with the top news!
Serbia hopes that the commissioning of the Bulgarian-Serbian gas interconnector (IGB) in 2023 would make it possible to integrate into the Southern Gas Corridor (SGC), Azerbaijani Energy Minister Parviz Shahbazov wrote on Twitter.
Construction of a new natural gas interconnector between Serbia and Bulgaria began on February 1 and is scheduled for completion in the fourth quarter of 2023.
The total length of the IGB pipeline is 182 km, of which 151 km will run through Bulgaria and 31 km through Greece. The annual throughput of the gas pipeline is provided in the amount of 3 billion cubic meters, but. if there is demand, the capacity can be expanded to 5 billion cubic meters per year.
Latest News
16:50
At least 15 killed in attack on military convoy in Nigeria
Other countries
16:35
CBA, WB mull trends in financial sector development
Finance
16:23
Photo
Azerbaijani weightlifter wins three medals at European Championships
Individual sports
16:14
Azerbaijan boosts barley exports to Iraq, resumes shipments to Iran
AIC
15:55
Video
Mass protest held against woman with Israeli, Turkish citizenship in Istanbul
Region
15:54
Kazakhstan's NSC thwarts plot to organize mass protests by oil workers
Region
15:25
Trump calls for France to close its borders immediately
Other countries
15:12
Photo
Inclusive Training Centre established at Baku State Vocational Education Centre for Culture and Crafts
Education and science
15:03
Photo
Baghdad Declaration includes provision on normalization process between Azerbaijan and Armenia
Foreign policy