Parviz Shahbazov: Serbia hopes for integration into SGC in 2023
Energy
- 04 February, 2022
- 11:51
Add Report.az to preferred Google sources
Stay up to date with the top news!
Serbia hopes that the commissioning of the Bulgarian-Serbian gas interconnector (IGB) in 2023 would make it possible to integrate into the Southern Gas Corridor (SGC), Azerbaijani Energy Minister Parviz Shahbazov wrote on Twitter.
Construction of a new natural gas interconnector between Serbia and Bulgaria began on February 1 and is scheduled for completion in the fourth quarter of 2023.
The total length of the IGB pipeline is 182 km, of which 151 km will run through Bulgaria and 31 km through Greece. The annual throughput of the gas pipeline is provided in the amount of 3 billion cubic meters, but. if there is demand, the capacity can be expanded to 5 billion cubic meters per year.
Pərviz Şahbazov: "Serbiya 2023-cü ildə SGC-yə inteqrasiyasına ümid edir"
Пярвиз Шахбазов: Сербия надеется на интеграцию в ЮГК в 2023 году
Latest News
09:10
Kremlin says trilateral meeting between leaders of Russia, US, China possible
Region
08:48
IRGC says tanker hits naval mine in Strait of Hormuz
Region
08:30
Ukraine discusses grain corridor with Türkiye, Egypt and India
Other countries
08:12
Türkiye to buy Russian diesel under Moscow-Washington deal
Region
08:01
Marco Rubio arrives in Uzbekistan
Region
07:54
Azerbaijani gymnasts crowned World Cup series champions
Individual sports
07:48
Photo
Azerbaijani judokas conclude Asian Open with 14 medals
Individual sports
07:43
Photo
Azerbaijani gymnast Seljan Mahsudova wins gold at World Cup
Individual sports
07:35
Photo
Photo exhibition on Armenia's mine warfare against Azerbaijan opens in Rome
Foreign policy