Parviz Shahbazov: Serbia hopes for integration into SGC in 2023
Energy
- 04 February, 2022
- 11:51
Add Report.az to preferred Google sources
Stay up to date with the top news!
Serbia hopes that the commissioning of the Bulgarian-Serbian gas interconnector (IGB) in 2023 would make it possible to integrate into the Southern Gas Corridor (SGC), Azerbaijani Energy Minister Parviz Shahbazov wrote on Twitter.
Construction of a new natural gas interconnector between Serbia and Bulgaria began on February 1 and is scheduled for completion in the fourth quarter of 2023.
The total length of the IGB pipeline is 182 km, of which 151 km will run through Bulgaria and 31 km through Greece. The annual throughput of the gas pipeline is provided in the amount of 3 billion cubic meters, but. if there is demand, the capacity can be expanded to 5 billion cubic meters per year.
Latest News
11:21
Turkish MFA congratulates Azerbaijan on Restoration of Independence Day
Foreign policy
11:15
TURKPA to hold 15th plenary session in Kyrgyzstan
Foreign policy
11:00
Photo
Azerbaijan, Uzbekistan trade unions sign cooperation memorandum
Social security
10:14
Azerbaijani MFA congratulates nation on Restoration of Independence Day
Foreign policy
09:50
First Vice-President Mehriban Aliyeva shared post on Day of Restoration of Independence
Domestic policy
09:46
Video
Preparations continue for FIFA U15 World Cup and Festival in Azerbaijan
Football
09:28
Türkiye, Germany discuss regional security and defense cooperation
Region
09:21
Two more Azerbaijani wrestlers win medals at U23 World Championships
Individual sports
04:49
Video
Hikmat Hajiyev shares post about documentary on history of Germans in Azerbaijan
Cultural policy