Armenian nuclear power plant suspends operation
Region
- 15 May, 2021
- 09:34
The Metsamor Nuclear Power Plant in Armenia has suspended operation due to the annual scheduled maintenance, during which the complete unloading of the reactor core will be carried out, Report informs referring to the plant’s website.
“On May 15, 2021, at 00:25 (GMT+4), the power unit No. 2 of the Metsamor Nuclear Power Plant began to shut down, and at 11:45 the power unit was disconnected from the power system of Armenia. The nuclear power plant stopped for an annual scheduled preventive maintenance for 141 days, which is due to the unprecedentedly large volume of work at the final stage of the program for extending the life of power unit No. 2 of the power plant,” reads the message.
Latest News
00:03
Saudi Aramco in talks to buy Ukrainian drones to protect oil fields
Other countries23:59
Anar Guliyev, Anacláudia Rossbach mull joint projects in Karabakh and East Zangazur
Infrastructure23:53
US shifts air defense systems from Europe to Middle East amid Iran conflict
Other countries23:52
American expert adds Ilham Aliyev to list of top impactful leaders
Foreign policy23:36
Photo
Azerbaijan's achievements in women's rights, digital development presented at UN
Foreign policy23:34
Military camp in southern Baghdad comes under attack
Other countries23:24
FM Ignazio Cassis thanks Azerbaijan for evacuation of Swiss citizens from Iran
Foreign policy23:13
Narendra Modi and Masoud Pezeshkian mull 'the serious situation in the region'
Region23:12