Armenian nuclear power plant suspends operation
Region
- 15 May, 2021
- 09:34
The Metsamor Nuclear Power Plant in Armenia has suspended operation due to the annual scheduled maintenance, during which the complete unloading of the reactor core will be carried out, Report informs referring to the plant’s website.
“On May 15, 2021, at 00:25 (GMT+4), the power unit No. 2 of the Metsamor Nuclear Power Plant began to shut down, and at 11:45 the power unit was disconnected from the power system of Armenia. The nuclear power plant stopped for an annual scheduled preventive maintenance for 141 days, which is due to the unprecedentedly large volume of work at the final stage of the program for extending the life of power unit No. 2 of the power plant,” reads the message.
Latest News
00:02
Montenegro MFA: Iranian drone attacks pose a serious threat to regional security
Foreign policy00:01
India fighter jet goes missing from radar
Other countries23:57
Azerbaijani ombudsman issues statement on Iranian drone attacks
Domestic policy23:51
UN spox expresses concern over Iran's drone attacks on Azerbaijan's Nakhchivan
Foreign policy23:43
Bahrain condemns Iranian drone attacks on Azerbaijan
Other countries23:32
International media highlights Ilham Aliyev's statements on Iran's drone strike
Foreign policy23:13
Pakistan's PM expresses concern over Iran's drone attacks on Azerbaijan
Foreign policy22:53
Three injured in Iran's drone attack on Nakhchivan discharged from hospital
Health22:44