Armenian nuclear power plant suspends operation
Region
- 15 May, 2021
- 09:34
The Metsamor Nuclear Power Plant in Armenia has suspended operation due to the annual scheduled maintenance, during which the complete unloading of the reactor core will be carried out, Report informs referring to the plant’s website.
“On May 15, 2021, at 00:25 (GMT+4), the power unit No. 2 of the Metsamor Nuclear Power Plant began to shut down, and at 11:45 the power unit was disconnected from the power system of Armenia. The nuclear power plant stopped for an annual scheduled preventive maintenance for 141 days, which is due to the unprecedentedly large volume of work at the final stage of the program for extending the life of power unit No. 2 of the power plant,” reads the message.
Latest News
08:16
'We choose Denmark' over US — Greenland PM
Other countries08:08
Qatar, Oman, Saudi Arabia urge US against striking Iran
Region21:28
Azerbaijan strengthens southern branch of Middle Corridor via new association
Infrastructure21:14
Napoli coach Conte gets two-game ban and fine after red card vs. Inter
Football21:00
Venezuela's FM: Presidential duties fulfilled, state institutions remain active
Foreign policy20:50
Hamas to elect first leader since Sinwar killed by Israel, sources say
Other countries20:41
Syrian President to pay official visit to Germany on Jan. 19
Other countries20:32
Bayramov: Azerbaijan hopes peace, stability to be established in Venezuela
Foreign policy20:26