Tunnel construction starts on Horadiz-Jabrayil-Zangilan-Agband highway
Infrastructure
- 08 December, 2021
- 15:46
Add Report.az to preferred Google sources
Stay up to date with the top news!
The construction of the Horadiz-Jabrayil-Zangilan-Agband highway (Zangazur corridor), laid on October 26 by the presidents of Azerbaijan and Turkey, continues at a rapid pace. Report informs, citing the State Agency for Highways of Azerbaijan.
According to the information, the project envisages the construction of three motor tunnels with a total length of 6 km on the new road. The tunnels will be called T1, T2, and T3.
It is planned to build 2 viaducts and 23 road bridges, 8 interchanges, 50 underground passages, 5 ground crossings on the Horadiz-Jabrayil-Zangilan-Agband highway with a length of 123.8 kilometers.
Latest News
02:29
Photo
Video
Sites of Memory of Western Azerbaijan: How was Amasia, once home to Azerbaijanis, Armenianized?
Domestic policy
00:01
Six years pass since another deadly missile attack on Ganja by Armenia
Domestic policy
00:00
Today marks sixth anniversary of Fuzuli's liberation from occupation
Domestic policy
23:41
Photo
Events calling on Armenia to address mine problem held in six European countries
Foreign policy
23:13
AI agents hack systems of several companies in India
ICT
22:53
Azerbaijani weightlifter Gasim Ismayilov claims three medals at European U-23 Championships in Albania
Individual sports
22:29
NYT: White House press secretary fired after five days on the job
Other countries
22:22
European Commission to propose additional funding for Ukraine in 2027
Other countries
22:12
Trump denies involvement in Starlink slowdown in Ukraine
Other countries