The Ministry of Territorial Management and Infrastructure of Armenia said the construction of the Armenian part of the corridor bypassing Lachin city would start in August, Report informs.
Azerbaijan built a new road bypassing the center of Lachin. The length of the new highway is 32 km. According to the project, the width of the road is 7-10.5 meters, the width of the soil bed is 12-15 meters, and the width of the shoulder sections is 2x2.5 (5 m) meters.
The new road will serve as a corridor. After that, the city of Lachin will come under the control of the Azerbaijani Army.
Armenian armed groups occupied Lachin on May 18, 1992. As a result of the Patriotic War that started on September 27, 2020 and lasted for 44 days, several villages of Lachin were freed from occupation.
According to the statement signed by President of Azerbaijan Ilham Aliyev, President of Russia Vladimir Putin and Prime Minister of Armenia Nikol Pashinyan on November 10, 2020, Lachin was returned to Azerbaijan on December 1. However, as the city of Lachin and several settlements were part of the corridor, they remained under the temporary control of Russian peacekeepers.