Pipeline for supply of Azerbaijan’s gas to Bulgaria 96% ready
Energy
- 05 November, 2021
- 09:21
Add Report.az to preferred Google sources
Stay up to date with the top news!
Work on the construction of the IGB (Gas Interconnector Greece - Bulgaria), designed to supply Azerbaijani gas to Bulgaria, and the implementation of the main construction activities are progressing at a good pace, Report informs referring to the ICGB website.
The welding activities are completed at 96% Over 145 km of the 182-kilometer route are now ready and lowered in the trench.
IGB is of key importance for increasing the security of supply and for ensuring diversification of natural gas sources for Bulgaria and for the region of Southeast Europe.
Latest News
11:00
Photo
Azerbaijan, Uzbekistan trade unions sign cooperation memorandum
Social security
10:14
Azerbaijani MFA congratulates nation on Restoration of Independence Day
Foreign policy
09:50
First Vice-President Mehriban Aliyeva shared post on Day of Restoration of Independence
Domestic policy
09:46
Video
Preparations continue for FIFA U15 World Cup and Festival in Azerbaijan
Football
09:28
Türkiye, Germany discuss regional security and defense cooperation
Region
09:21
Two more Azerbaijani wrestlers win medals at U23 World Championships
Individual sports
04:49
Video
Hikmat Hajiyev shares post about documentary on history of Germans in Azerbaijan
Cultural policy
04:39
Five years pass since liberation of Khudafarin bridge from occupation
Domestic policy
04:34
Azerbaijan marks 35th anniversary of restored independence
Domestic policy