Parviz Shahbazov: 8 industrial-scale power plants will be commissioned by 2027
Energy
- 21 February, 2024
- 08:03
Add Report.az to preferred Google sources
Stay up to date with the top news!
8 industrial-scale power plants will be put into operation by 2027 for the decarbonization of the Sangachal terminal, the Minister of Energy of Azerbaijan, Parviz Shahbazov, said in a meeting with Rick Duke, Deputy Special Envoy for Climate, Office of the US Special Presidential Envoy for Climate, Report informs, citing the Ministry of Energy.
Azerbaijan's course to accelerate the green energy transition during the COP29 presidency, Nationally Determined Contributions (NDC), and cooperation with the United States on the green energy corridor were discussed at the meeting.
Latest News
09:33
Indian Foreign Minister Kirti Vardhan Singh arrives in Azerbaijan for CICA summit
Foreign policy
09:32
Lithuanian ambassador congratulates Sabah on historic Champions League victory
Foreign policy
09:24
Azerbaijan climbs one spot in UEFA rankings
Football
09:20
CBA currency exchange rates (14.10.2026)
Finance
09:13
Azerbaijani wrestler Elmir Aliyev wins silver at U23 World Championships
Football
09:08
Key indicators of world commodity, stock, and currency markets (14.10.2026)
Finance
08:59
Russia launches new wave of massive airstrikes on Kyiv
Other countries
08:48
5.7-magnitude earthquake strikes off Papua New Guinea
Other countries
08:37
Kyiv hit by S-400 strikes without air raid alert
Other countries