Parviz Shahbazov: 8 industrial-scale power plants will be commissioned by 2027
Energy
- 21 February, 2024
- 08:03
Add Report.az to preferred Google sources
Stay up to date with the top news!
8 industrial-scale power plants will be put into operation by 2027 for the decarbonization of the Sangachal terminal, the Minister of Energy of Azerbaijan, Parviz Shahbazov, said in a meeting with Rick Duke, Deputy Special Envoy for Climate, Office of the US Special Presidential Envoy for Climate, Report informs, citing the Ministry of Energy.
Azerbaijan's course to accelerate the green energy transition during the COP29 presidency, Nationally Determined Contributions (NDC), and cooperation with the United States on the green energy corridor were discussed at the meeting.
Latest News
01:40
Photo
Authorities deny alleged hijab ban in Azerbaijani medical facilities
Domestic policy
00:01
23 years since Ilham Aliyev was first elected President of Azerbaijan
Domestic policy
23:47
Slovakia will not join new European loan for Ukraine
Other countries
23:30
Gold prices fall sharply as stronger US inflation boosts dollar
Finance
22:50
Photo
Dinner hosted on behalf of President Ilham Aliyev in honor of participants of 7th CICA Summit
Foreign policy
22:38
President Ilham Aliyev met with President of Tajikistan
Foreign policy
22:36
Two ships sink near Strait of Hormuz after projectile strikes
Other countries
22:08
Photo
President Ilham Aliyev met with President of Uzbekistan - UPDATED
Foreign policy
21:56
Davr Bank renamed ABB Davr Bank as management is restructured
Finance