Parviz Shahbazov: 8 industrial-scale power plants will be commissioned by 2027
Energy
- 21 February, 2024
- 08:03
Add Report.az to preferred Google sources
Stay up to date with the top news!
8 industrial-scale power plants will be put into operation by 2027 for the decarbonization of the Sangachal terminal, the Minister of Energy of Azerbaijan, Parviz Shahbazov, said in a meeting with Rick Duke, Deputy Special Envoy for Climate, Office of the US Special Presidential Envoy for Climate, Report informs, citing the Ministry of Energy.
Azerbaijan's course to accelerate the green energy transition during the COP29 presidency, Nationally Determined Contributions (NDC), and cooperation with the United States on the green energy corridor were discussed at the meeting.
Pərviz Şahbazov: “2027-ci ilədək 8 sənaye miqyaslı elektrik stansiyası istismara veriləcək”
Пярвиз Шахбазов: К 2027 году будут введены в эксплуатацию 8 электростанций промышленного масштаба
Latest News
22:08
Photo
President Ilham Aliyev met with President of Uzbekistan - UPDATED
Foreign policy
21:56
Davr Bank renamed ABB Davr Bank as management is restructured
Finance
21:30
UK to accelerate deliveries of air defense systems to Ukraine
Other countries
21:24
Tofig Musayev: Azerbaijan remains committed to NPT obligations
Foreign policy
21:01
Lavrov, Wang Yi discuss CICA cooperation during meeting in Baku
Other countries
20:55
Wang Yi highlights Azerbaijan's key role in Middle Corridor
Foreign policy
20:41
Ilham Aliyev highlights importance of Belt and Road Initiative
Foreign policy
20:35
Photo
Azerbaijani family's apartment damaged in Russian strike on Kyiv
Other countries
20:13
Photo
President Ilham Aliyev received member of Political Bureau of CPC Central Committee
Foreign policy