Finnish operator preparing to repair Balticconnector gas pipeline
Energy
- 21 December, 2023
- 12:46
Preparations for the repair of the Balticconnector gas pipeline are progressing according to schedule; it may be commissioned in April 2024, according to the Finnish operator Gasgrid Finland, Report informs referring to Russian media.
The pipeline repair plan was developed in cooperation between the Finnish operator Gasgrid and the Finnish Elering.
The report notes that putting Balticconnector into operation is technically possible in April 2024, but this requires appropriate planning and repair work. It is clarified that the materials necessary for repairing the pipeline have already been manufactured, and the selection of key partners has been completed.
Latest News
12:50
Azerbaijan seeks to advance climate agenda at home and abroad
Foreign policy12:47
Faig Mutallimov: Climate action goes beyond energy production
Energy12:46
Azerbaijan highlights circular economy role in cutting emissions
Energy12:43
Azerbaijan calls for closer alignment of climate, urban agendas
Domestic policy12:39
Azerbaijan drafts national waste strategy for 2027–2030
Ecology12:32
Circular economy key to achieving climate goals, driving growth, UNDP official says
Ecology12:30
Temperatures to reach 28°C in Baku on September 11
Ecology12:29
UN: Impact of waste pollution on oceans, seas and rivers worsening every day
Foreign policy12:22