Azerenergy: ‘6 HPPs in Kalbajar have been rebuilt and put into operation’

AzerEnergy has rebuilt and put into operation 6 small hydroelectric power stations (HPS) in the Kalbajar district, Report informs.

According to information, the “Kalbajar-1” station with a capacity of 4.4 megawatts was put into use in 2022, the “Chirag-1” station with a capacity of 8.33 megawatts, “Chirag-2” with 3.6 megawatts, “Gamishli” with 6.33 megawatts, “Soyugbulag” with 5.3 megawatts, and “Meydan” with 3.4 megawatts were launched in 2023.

At present, 4 HPS (Ashagi Vang, Yukhari Vang, Nadirkhanli, and Zar) are under construction in Kalbajar and planned to be commissioned in 2024.

Other News

Brent falls to $105.51 per barrel 13 October, 2026 / 11:23