Solar power plants to be built in 6 liberated regions
Karabakh
- 09 March, 2021
- 12:01
The territories with a potential of 7,214 MW of solar energy and 2,120 MW of wind energy have been designated for the construction of solar power plants in six liberated regions under the leadership of the Supreme Commander-in-Chief .
According to Report, this was stated in the report of the Cabinet of Ministers for 2020.
The document says that systemic measures are underway in this direction.
Latest News
12:50
Azerbaijan seeks to advance climate agenda at home and abroad
Foreign policy12:47
Faig Mutallimov: Climate action goes beyond energy production
Energy12:46
Azerbaijan highlights circular economy role in cutting emissions
Energy12:43
Azerbaijan calls for closer alignment of climate, urban agendas
Domestic policy12:39
Azerbaijan drafts national waste strategy for 2027–2030
Ecology12:32
Circular economy key to achieving climate goals, driving growth, UNDP official says
Ecology12:30
Temperatures to reach 28°C in Baku on September 11
Ecology12:29
UN: Impact of waste pollution on oceans, seas and rivers worsening every day
Foreign policy12:22