Construction of a new railway from Astara to Iran ends
Infrastructure
- 07 November, 2016
- 09:43
Add Report.az to preferred Google sources
Stay up to date with the top news!
Baku. 7 November. REPORT.AZ/ Construction of 8.3 km new one-way railway from Azerbaijan's Astara station to Iran's state border has been completed.
4 stands and walls constructed and concreted over the Astara river bridge.
Spokesperson of Azerbaijan Railways CJSC Nadir Azmammadov told Report that the final works are being done. At present, the arches and guardrails installation process is underway.
Construction of 82.5 meters long railway bridge over Astara river on Iranian state border have started on April 20, 2016.
13 water plants installed for wastewater discharge, 2 tunnels were built under the road bed for the purpose of inter-village road.
Photo
Photo
Latest News
12:41
Azerbaijan U23 beat UAE at Minifootball World Cup
Football
12:40
Photo
President of Laos visits ASAN xidmət center
Social security
12:37
Sergey Lavrov to attend CICA Summit in Baku
Foreign policy
12:35
Ilham Aliyev: Murovdag tunnel stands as important example of engineering in complex mountainous terrain
Infrastructure
12:34
Photo
Speaker of Belarusian Parliament's House of Representatives visits Khankandi
Domestic policy
12:31
Joy-Lance Mickels: Being named Player of the Match against Slavia is special to me
Football
12:29
Elnur Aliyev: Transformation roadmaps prepared for 18 local enterprises
Business
12:29
President: Azerbaijan's urban planning experience can be used internationally
Infrastructure
11:54
Macron to convene Defense and National Security Council meeting on AI
Other countries