New wind power plant to be built in Baku
Energy
- 16 April, 2024
- 15:10
Add Report.az to preferred Google sources
Stay up to date with the top news!
The Republic of Azerbaijan’s Cabinet of Ministers has designated certain parcels of land within the administrative boundaries of the Garadagh and Absheron districts in Baku city, which are owned by the state and municipality, as zones for renewable energy sources, Prime Minister Ali Asadov signed a new decision in this regard, Report informs.
According to the decision, the specified land area has been designated for renewable energy utilization, aimed at constructing a wind power plant with a capacity of 240 megawatts.
The supervision of the implementation of this Decision was entrusted to the Department of Agriculture and Ecology of the Office of the Cabinet of Ministers.
Latest News
21:30
UK to accelerate deliveries of air defense systems to Ukraine
Other countries
21:24
Tofig Musayev: Azerbaijan remains committed to NPT obligations
Foreign policy
21:01
Lavrov, Wang Yi discuss CICA cooperation during meeting in Baku
Other countries
20:57
Photo
President Ilham Aliyev met with President of Uzbekistan
Foreign policy
20:55
Wang Yi highlights Azerbaijan's key role in Middle Corridor
Foreign policy
20:41
Ilham Aliyev highlights importance of Belt and Road Initiative
Foreign policy
20:35
Photo
Azerbaijani family's apartment damaged in Russian strike on Kyiv
Other countries
20:13
Photo
President Ilham Aliyev received member of Political Bureau of CPC Central Committee
Foreign policy
20:10
Photo
President Ilham Aliyev received Bahrain's Minister of Foreign Affairs
Foreign policy