New wind power plant to be built in Baku
Energy
- 16 April, 2024
- 15:10
Add Report.az to preferred Google sources
Stay up to date with the top news!
The Republic of Azerbaijan’s Cabinet of Ministers has designated certain parcels of land within the administrative boundaries of the Garadagh and Absheron districts in Baku city, which are owned by the state and municipality, as zones for renewable energy sources, Prime Minister Ali Asadov signed a new decision in this regard, Report informs.
According to the decision, the specified land area has been designated for renewable energy utilization, aimed at constructing a wind power plant with a capacity of 240 megawatts.
The supervision of the implementation of this Decision was entrusted to the Department of Agriculture and Ecology of the Office of the Cabinet of Ministers.
Latest News
18:26
Azerbaijan, Latvia discuss defense and defense industry cooperation
Foreign policy
18:01
Tokayev: Trans-Caspian Fiber-Optic Cable is project of international significance
Foreign policy
17:54
Photo
Baku hosts 7th CICA Summit, President Ilham Aliyev addresses the event - Updated
Foreign policy
17:52
Ilham Aliyev: Trans-Caspian fiber-optic cable strengthens ties with Central Asia
Foreign policy
17:41
Baku hosts exchange of Azerbaijan-Kazakhstan transport cooperation documents
Foreign policy
17:33
Photo
Azerbaijan, Paralympic bodies discuss joint initiatives and projects
Individual sports
17:24
Photo
Presidents of Azerbaijan and Kazakhstan met in Baku and inaugurated Trans-Caspian Fiber-Optic Cable Line
Foreign policy
17:16
Global economic developments and their impact on Azerbaijan discussed in Bangkok
Finance
17:13
Erdoğan to run for president for the last time
Region