In April 2026, daily oil exports through the Baku–Tbilisi–Ceyhan (BTC) pipeline averaged 541,000 barrels, Report informs, citing OPEC.
According to OPEC's monthly report, BTC oil transportation in April fell by 8% compared to March, or by 47,000 barrels per day.
During the reporting period, oil transportation through BTC was down 11% compared to April 2025, or 64,000 barrels per day.
The BTC pipeline was inaugurated on July 13, 2006. Its length is 1,768 kilometers: 443 km in Azerbaijan, 249 km in Georgia, and 1,076 km in Türkiye.