3 hydropower plants being rebuilt in Azerbaijan's liberated territories

Azerenerji OJSC, Azerbaijan’s grid operator, will rebuild the Gozlu Bridge, Sheylanli and Ashaghi Malibayli small hydroelectric power plants located in the liberated territories of the country, Report informs, citing Azerenerji.

In addition, 6 small hydroelectric power plants will be integrated into the grid.

Latest news

President Ilham Aliyev meets UK PM 12 November, 2024 / 20:53
Greek PM arrives in Azerbaijan 12 November, 2024 / 20:50