3 hydropower plants being rebuilt in Azerbaijan's liberated territories

Azerenerji OJSC, Azerbaijan’s grid operator, will rebuild the Gozlu Bridge, Sheylanli and Ashaghi Malibayli small hydroelectric power plants located in the liberated territories of the country, Report informs, citing Azerenerji.

In addition, 6 small hydroelectric power plants will be integrated into the grid.

Other News

Brent crude rises to $61.71 per barrel 12 December, 2025 / 10:18